  • Coca Cola Enterprises

    Coca Cola Enterprises

    The task was to install the cabling for cameras that would allow the customer to monitor their products as they move along the fully automated manufacturing and packaging system.

    This is an on-going project with Illuma-Tech working on behalf of one of the most well established security companies.

    These are just a handful of the projects that have been carried out. We carry out maintenance and servicing for many other companies such as bingo halls, MOD sites and local councils. 

  • Whitworths

    Whitworths

    Whitworths are another of the UK’s largest food manufacturers based in Northampton.

    The task was to remove the existing light fittings to 5 of the main warehouses and fit new energy efficient lighting according to the results of a full lighting design survey. The installation also included installing special control gear that allowed the customer to fully monitor and control their lighting giving them the scope to save money. Over 250 fittings were installed and the wiring was re-worked where necessary. This project was completed within 3 weeks.

  • Premier Foods

    Premier Foods

    Premier foods are one of the UK’s largest food manufacturers, operating 24 hours a day 7 days a week.

    The task was to replace 7 emergency lighting static inverters and fully commission. Special care had to be taken due to the nature of the customers work. The project had to be carried out as not to interfere with production. The project was completed in a total of 14 days on site, including removal of all waste from site.

  • Vesuvius

    Vesuvius

    Vesuvius produce and supply products for use in the steel industry.

    The task was to fully install LED emergency lighting self-contained bulkheads across the whole manufacturing site comprising of over 20 separate buildings. Working closely with the customer to produce a detailed installation schedule, the system was fully commissioned and operational within 5 weeks of starting

  • Haltwhistle Community Campus

    Haltwhistle Community Campus

    Hatwhistle campus is a school which has recently been converted to an academy and comprises of an upper campus and lower campus.

    Working alongside of of the UK’s leading manufacturers of lighting and power systems we were given the task of wiring and fully installing a new LED emergency lighting system in each campus along with a static inverter in each. Over 300 fittings and 2500 metres of cable were installed within the 6 weeks school holidays. The systems were both fully operational for the school opening again.